Filter Projects for a Specific Feature:
- * All Projects *
- Stream Restoration
- Habitat Enhancement
- Fish Passage
- Construction Supervision
- Vegetation Parks & Plans
- Stormwater Management
- Wetland Mitigation
- Bank & Channel Stabilization
Showing: All Projects
City of Kent, 2006.
- supervision
- Provide grade control and on-site construction supervision for rough grading of a 3-acre park.
Earthcorps, 2007.
- stream supervision
- Stream restoration in Seattle along 500 ft of Thornton Creek
- Channel widening
- LWM installation
- Replacement of two driveway bridges
City of Bellevue, 2007.
- stabilization supervision
- Hand-installation of nearly 500 logs along 1,500 ft of creek
- Stabilize creek bed and banks
City of Kent, 2007.
- wetland
- Develop wetland mitigation plan and permitting materials for impacts to existing wetlands.
City of Seattle, 2006.
- habitat fish stabilization supervision
- Provided design-build services to replace a failed sewer crossing through Thornton Creek
- Design included fish passage
City of Seattle, 2006.
- plans
- Development of vegetation management plan for 2.2 acre neighborhood park.
Friends of Hylebos, 2006.
- plans
- Mapping and analysis of forest health of the 120 acre West Hylebos State Park.
City of Kent, 2005-2006.
- stream habitat fish supervision stormwater stabilization
- Flood relief
- Streambed stabilization
- Habitat enhancement with LWD
- Restore fish passage through braided reach
Friends of the Hylebos Wetlands, 2005.
- parks
- Stream realignment and habitat enhancement
City of Bellevue, 2005-2006.
- habitat supervision stabilization
- Bank stabilization with LWD
City of Seattle, 2006.
- habitat fish supervision stabilization
- Sewer line stream crossing stabilization
- fish passage
- habitat enhancement
City of Seattle and EarthCorps, 2006.
- habitat supervision
- Habitat and floodplain connection enhancement
City of Kent, 2004.
- wetland
- Integrated stormwater pond
- Wetland mitigation
- Stream channel reconstruction